Live demo · Okan Sparks · Built with Stead — a working site in 30 minutes

Commercial & luxury residential · Post-construction cleaning

Where construction ends,perfection begins.

BEFORE → AFTERSee the difference

White-glove cleaning between the last trade out and the keys handed over. Rough, final, and touch-up cleans for general contractors, developers, and luxury homebuilders.

Why GCs call us
InsuredPublic liability and workmen’s compensation cover on every job
Safety firstTrained crews, full PPE, site rules followed
On timeScheduled backwards from your handover date
TrustedRepeat work for contractors, developers, and builders

Ready for handover,on your schedule.

/01Our standard

White-glove precision between construction completion and final handover.

About us
/02Our mission

Hand every owner a building that looks the way it was drawn.

  • Rough clean
  • Final clean
  • Touch-up & punch list
After drywall
BEFORE After drywallAFTER Ready for handover

Drag to compareAfter drywall → ready for handover

The principles behind every handover

Precision. Quality. Luxury. Finish.

From the people who hand us their keys

They were on site the morning after drywall and gone the day before our walkthrough. The owner didn’t find a single mark.
Project manager[Commercial general contractor]01 / 03

Every phase between drywall dust and a signed-off walkthrough, handled by one crew that knows the site.

Every phase between drywall dust and a signed-off walkthrough

    /01

    Rough clean

    Debris, dust, and packaging out while trades finish. The site stays safe and ready for the next crew.

    /02

    Final clean

    Top-to-bottom detail before the owner walkthrough: fixtures, cabinetry, vents, glass, and every surface.

    /03

    Touch-up & punch list

    The last pass after walkthrough notes. Fingerprints, smudges, and anything a punch list turns up.

    /04

    Windows & glass

    Interior and exterior glass, frames, and tracks. Paint, sticker residue, and mortar spatter removed.

    /05

    Floor care & polish

    Scrubbing, stripping, and polishing for stone, tile, concrete, and hardwood, finished to spec.

    /06

    Exterior & site

    Walkways, entries, patios, and pools. Pressure washing and a site that looks ready at the curb.

One crew lead per site, scheduled backwards from your handover date.

From last trade out to keys handed over

    T – 14 days01

    Walkthrough & scope

    We walk the site with your superintendent and price rough, final, and touch-up as separate phases.

    During trades02

    Rough clean

    Debris and dust out as trades finish, so each crew starts on a clean, safe floor.

    T – 3 days03

    Final clean

    Every surface, fixture, vent, and pane detailed to the standard of the finishes.

    After walkthrough04

    Touch-up

    We clear the punch list notes the same day, before the keys change hands.

    Handover05

    Completion report

    Room-by-room photos so you can sign off with confidence.

Handed over clean.Proven on the jobs that matter.

Recent handovers across commercial and luxury residential work.

Okan Sparks crew in full PPE on sitePPE · INSURED · SDS

Safety

Trained for an active site, not just an empty one.

  • Site-specific orientation before day one
  • Full PPE: hard hats, hi-vis, eye and hand protection
  • Proof of liability and workmen’s compensation cover before we start
  • Safety data sheets for every product on site
  • A named crew lead and daily sign-in
Ask for our safety packet

Frequently asked questions

Straight answers for general contractors, developers, and homebuilders. Anything else, ask us on the walkthrough.

As soon as you know your handover date. We schedule backwards from it: rough cleans run while trades finish, and the final clean lands a few days before the owner walkthrough.

Yes. Rough cleans are built for an active site. Our crew lead coordinates with your superintendent and follows your site rules.

Yes. We send proof of public liability and workmen’s compensation cover before we start, and every crew member works in full PPE and follows your site safety rules.

By phase and floor area, after a walkthrough. You get a separate scope for rough, final, and touch-up cleans, so you can see what each phase covers.

A completion report with photos, room by room, so the owner walkthrough is a formality.

Request a bid

Tell us the site and the handover date.

Send the site, the floor area, and your handover date. We walk the job, price it by phase, and hold your turnover date.

Priority site walkthroughHold a walkthrough slot this week. Credited to your first invoice.

Okan Sparks

Tell us the site, the floor area, and your handover date. We reply with a walkthrough time.

bids@okansparks.com

Request a bid

Request a bid